U.S. Virgin Islands

Permit Experience:

Federal Permitting Support

U.S. Army Corps of Engineers (USACE) Section 10/404 Permits: We assist with applications for activities involving dredging, filling, or construction in navigable waters and wetlands, including marina development, shoreline stabilization, and submerged infrastructure.

National Environmental Policy Act (NEPA) Coordination: We prepare Environmental Assessments (EAs) and support Environmental Impact Statements (EISs) when required, ensuring alignment with federal review processes.

Endangered Species & Cultural Resource Reviews: We coordinate with federal agencies such as the U.S. Fish and Wildlife Service and NOAA to address potential impacts on protected species and historic resources.

Local Environmental Permitting

Virgin Islands Department of Planning and Natural Resources (DPNR): We manage applications for Coastal Zone Management (CZM) permits, Earth Change permits, and Water Quality Certifications, ensuring full compliance with territorial statutes.

Environmental Impact Reports & Public Hearings: We prepare technical documentation and represent clients during public meetings and stakeholder consultations to facilitate transparent and efficient permitting.

Stormwater & Wastewater Approvals: We assist with design reviews and permitting for stormwater management systems, wastewater treatment, and discharge compliance under local and EPA Region 2 standards.

Multi Agency Permitting

Unified Permit Roadmapping Develop consolidated timelines that align USACE Section 10/404 and NEPA requirements with DPNR CZM, Earth Change, Water Quality, Stormwater, and Wastewater permits—minimizing review overlaps and avoiding scheduling conflicts.

Joint Agency Liaison Facilitate pre-application conferences, technical workshops, and coordinated site inspections with USACE, USFWS, NOAA, EPA Region 2, and DPNR to build consensus early and address multi-jurisdictional questions in real time.

Cross-Referenced Application Packages Craft permit submittals that satisfy both federal and local formatting, data, and procedural standards—eliminating redundancy, reducing staff hours, and accelerating agency acceptance.

Our Expertise:

  • Regulatory Guidance & Strategy: Navigating federal, state, and local CZM regulations, including consistency determinations under the Coastal Zone Management Act.

    Permit Application Preparation: Developing and submitting complete permit packages tailored to project scope, location, and jurisdictional requirements.

    Stakeholder Coordination: Engaging with regulatory agencies, environmental consultants, and community stakeholders to streamline approvals and minimize delays.

    Environmental Impact Assessment: Supporting documentation and analysis related to habitat protection, water quality, erosion control, and public access.

  • Regulatory Compliance Strategy: We interpret and apply relevant statutes such as the Endangered Species Act (ESA), Migratory Bird Treaty Act, and applicable state and local conservation laws to ensure your project meets all legal obligations.

    Section 7 & Section 10 Consultations: We coordinate with the U.S. Fish and Wildlife Service (USFWS) and National Marine Fisheries Service (NMFS) to facilitate formal and informal consultations, including Biological Assessments and Habitat Conservation Plans.

    Habitat Assessments & Field Surveys: Our team conducts site-specific evaluations to identify critical habitats, assess species presence, and determine potential impacts. We use best-practice methodologies and GIS mapping to support defensible findings.

    Mitigation Planning & Implementation: We develop customized mitigation strategies—including habitat restoration, conservation banking, and species relocation plans—to minimize ecological impacts and streamline permitting.

    Agency & Stakeholder Engagement: We manage communications with regulatory bodies, tribal governments, and local conservation groups to build consensus and expedite approvals.

  • SWPPP Development & Implementation: We prepare site-specific Stormwater Pollution Prevention Plans that identify potential sources of stormwater pollution and outline Best Management Practices (BMPs) to prevent sediment, debris, and contaminants from entering nearby water bodies. Plans are tailored to the unique topography, rainfall patterns, and coastal sensitivities of the USVI.

    TPDES Permitting Support: We assist with obtaining coverage under the Tropical Pollutant Discharge Elimination System (TPDES) or equivalent Virgin Islands discharge permits, ensuring alignment with EPA Region 2 requirements and local Department of Planning and Natural Resources (DPNR) standards.

    Erosion & Sediment Control Design: Our team develops practical erosion control strategies—including silt fencing, inlet protection, and stabilized construction entrances—designed to withstand tropical storm conditions and steep terrain common in the islands.

    Regulatory Coordination: We liaise with the Virgin Islands DPNR, EPA Region 2, and other relevant agencies to streamline approvals, respond to technical reviews, and ensure timely permit issuance.

    Training & Compliance Monitoring: We offer contractor training on SWPPP implementation and conduct routine site inspections to verify compliance, document corrective actions, and maintain permit coverage throughout the construction lifecycle.

Learn More