Permitting and Regulatory Compliance
Experience Across the State
Through all 67 counties & 5 districts in Florida, TriVerra has expertise established through experience. For over 25 years our team has seen everything from common issues with applications, overlooked compliance, to even the most complex & unique permits. We understand the importance of getting things done right. Compliance is our solution, therefore communication is our creed.
Pre-application Planning and Feasibility Reporting
→ We evaluate site conditions, environmental sensitivities, and land-use constraints to determine which permits apply. This phase combines desktop reviews of aerial imagery and regulatory GIS layers with preliminary site walks. We deliver a tailored permitting roadmap that outlines timelines, budget estimates, and potential mitigation or design modifications.
Environmental Resource Permits for Dredge-and-Fill
→ We manage environmental resource permit (ERP) applications for potential activities in wetlands and surface waters under applicable regulations like FDEP and South Florida Water Management District (SFWMD). Services include wetland delineations, impact quantification, compensatory mitigation planning, and preparation of the ERP application. We coordinate public notices, agency reviews, and site inspections to guide approvals on schedule.
Stormwater Permitting under NPDES and SFWMD
→ Our team prepares National Pollutant Discharge Elimination System (NPDES) applications alongside SFWMD stormwater permits. We develop hydrologic and hydraulic models, craft Stormwater Pollution Prevention Plans (SWPPPs), and specify best-management practices. Post-approval, we assist with permit-required monitoring, sampling, and annual reporting.
Coastal Construction Control Line (CCCL) & Beach Re-nourishment
→ We navigate Florida’s Coastal Construction Control Line statutes to obtain permits for seaward development and beach nourishment. Tasks include coastal impact assessments, shoreline change analyses, and coordination with FDEP’s Division of Water Resource Management. We handle joint reviews with U.S. Army Corps of Engineers (USACE), or local municipalities when federal approvals are triggered.
Wellfield and Consumptive Use - Permits
→ Our experts prepare Consumptive Use Permit (CUP) applications for water withdrawals, covering wellfield siting, sustainable-yield modeling, and aquifer testing. We demonstrate no‐harm to existing users, springs, or wetlands by performing groundwater flow analyses and water budget calculations. The CUP dossier includes technical reports, supporting data, and responses to agency data-requests.
Agency Liaison, Compliance Tracking, and Renewals
→ We serve as your single point of contact with FDEP, SFWMD, EPA, local governments, and community stakeholders. Beyond permitting, we set up compliance tracking systems, manage monitoring programs, and compile annual or event-driven reports. When permit expirations or scope changes arise, we handle modifications and renewals to keep your project fully authorized.
Additional Insights and Next Steps
-
Typical permitting timelines range from 8 weeks for straightforward NPDES permits to 6 months or more for complex ERPs or CCCL approvals. Current DEP timelines are averaging 12 months
-
Early pre-application meetings with regulators can flag major issues and save substantial time and cost during the formal review.
-
Integrating mitigation and monitoring into project design not only satisfies regulators but can also streamline construction sequencing.
-
Leveraging digital tools (GIS overlays, online submittal portals, automated reminders) enhances transparency and keeps all stakeholders aligned.